DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Business & Finance›UAE: Cutter Suction Dredger CSD 500 Launched by APT Global Shipyard, Dubai
Business & Finance

November 24, 2011 · about 15 years ago

UAE: Cutter Suction Dredger CSD 500 Launched by APT Global Shipyard, Dubai

On 16th November 2011, the Al Jadaf Dockyard, Dubai witnessed a colorful launching ceremony of the newly built second Cutter Suction Dredger (CSD 500) which is constructed by APT Global Shipyard on behalf of VostaLMG. The Management of APT Global and Representatives of VostaLMG congratulated all the

1 minutes read
  • LinkedIn
  • X
  • Email

On 16th November 2011, the Al Jadaf Dockyard, Dubai witnessed a colorful launching ceremony of the newly built second Cutter Suction Dredger (CSD 500) which is constructed by APT Global Shipyard on behalf of VostaLMG.

The Management of APT Global and Representatives of VostaLMG congratulated all the team members and supporters on this auspicious occasion for bringing a dream into reality by constructing Two Dredgers within a period of six months.

The contract for construction of the two vessels was signed between VostaLMG and APT Global Shipyard in May 2011, and the keel was laid on 2nd June 2011. The CSD 500 is engineered by VostaLMG and fully constructed by APT Global Marine Services LLC.

Vessel Information

Type: CUTTER SUCTION DREDGER 500

Ship Builder: APT Global Marine Services LLC

Length Overall: 38 meters

Breadth over pontoon: 2.75 meters

Dredging Depth: min. 2- / max. 15 meters

Discharge Diameter: 500 mm

Total Installed Power: 1270 Kilowatt

Cutter Power: 175 Kilowatt

Pump Power: 950 Kilowatt

Class: Bureau Veritas

[mappress]

Dredging Today Staff, November 24, 2011; Image: aptglobalmarine

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Business & FinanceVessels

Daily Dredging and Port Construction News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Dredging begins at Double Creek Channel entrance
  2. 2Work on Grand Isle shoreline breakwaters in full swing
  3. 3Shapiro: $837M investment supports largest expansion in PhilaPort’s history
  4. 4BREAKING NEWS: New TSHD takes shape in Poland

Daily Dredging and Port Construction News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free