DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›News›Santos Brasil Orders 12 Kalmar All-Electric E-One2 RTGs
News

May 5, 2011 · about 15 years ago

Santos Brasil Orders 12 Kalmar All-Electric E-One2 RTGs

Cargotec has received a further order from Santos Brasil S/A for 12 Kalmar E-One2 rubber-tyred gantry (RTG) cranes. The agreement confirms one of South America’s leading container terminal operators as the biggest customer of Kalmar E-One RTGs worldwide totalling 41 machines. The units were ordered

2 minutes read
  • LinkedIn
  • X
  • Email

Cargotec has received a further order from Santos Brasil S/A for 12 Kalmar E-One2 rubber-tyred gantry (RTG) cranes. The agreement confirms one of South America’s leading container terminal operators as the biggest customer of Kalmar E-One RTGs worldwide totalling 41 machines.

The units were ordered to equip the customer’s newly inaugurated Tecon Santos Terminal 4 expansion. Their delivery will commence in the fourth quarter of 2011. The parties have agreed not to disclose the value of the order. The order has been booked in the first quarter of 2011.

Santos Brasil’s new all-electric, environmentally-friendly 16-wheel RTGs will be 7+1 wide and 1-over-6 high and come equipped with Kalmar Smartrail®, an autosteering and container position verification system. Cargotec’s 16-wheel design, in combination with the light weight of its cranes, puts less stress on terminal surfaces compared to conventional 8-wheel units. The terminal operator’s cranes will feature 55-tonne capacity twin-lift Bromma spreaders with load sensing capability via the twistlocks.

Operating at the Port of Santos, Santos Brasil has been a Cargotec customer since 2000, and in addition to its existing 29 Kalmar RTGs, the operator has empty container handlers, reachstackers and heavy-duty forklifts from Cargotec.

Caio Morel , Santos Brasil’s Operations Director, points out that standardising equipment offers some important benefits. “ In terms of maintenance it is a significant advantage to have a standardised set of equipment. If the equipment is in need of maintenance all we need to do is cross the road from Tecon Santos to Cargotec’s service facilities, where we benefit from quick and personalised after-sales service ,” he says.

Tecon Santos Brasil is the largest and most efficient container terminal in the country, capable of handling 2 million TEUs per year.

[mappress]

Source: cargotec, May 6, 2011;

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

News

Daily dredging and port construction news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1PHOTO OF THE DAY: Argentina dredges its canals before El Niño
  2. 2Høj Nordic completes Schleswig-Holstein annual dredging
  3. 3Oceanside Harbor's channel dredging about to begin
  4. 4HERBOSCH-KIERE's Atlantis wraps up work at Dumping Area 42

Daily dredging and port construction news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free